Offshore Oil & Gas
References
![Stinger Handling Frame](https://www.smulders.com/library/reference/1443179658.7393.jpg)
Smulders was responsible for the design, production, corrosion protection and assembly of stinger handling frame and stinger handling system. Because of that, a bulk carrier was converted to a ship for laying pipelines in the sea (Audacia).
Project data:
- Client: Allseas
- Weight: 950 tonnes